🏭Manufacturer since 1987 · 3 production bases: Hangzhou · Weihai · Wuhu
Project · Bosnia · Europe

Bosnia — complete equipment set for a highway project

Infrastructure work has a specification, an inspection regime and a deadline that does not move for equipment problems. This project was supplied as one complete set from one manufacturer.

HighwayApplication
Full setCrushing + screening
One supplierAll interfaces owned
EuropeCE-relevant duty

Why infrastructure projects buy differently

A highway job has an aggregate specification written into the contract, a consultant who inspects against it, and a schedule set by the paving programme. There is no commercial room for a supplier blaming a second supplier for a gradation problem — the client needs one party answerable for the product coming off the belt.

That is the reason this project was placed as a complete equipment set rather than line item by line item. Crushing, screening and the equipment between them came from one manufacturer, with one set of drawings and one responsible party for the interfaces.

What was supplied

A complete crushing and screening set for highway aggregate production: primary crushing, secondary cone reduction, multi-deck screening producing the specification cuts, and the supporting feeding equipment — packed and shipped as one package, with documentation prepared for European import and the client's inspection process.

What a European project demands that others do not

Documentation discipline. Material certificates, inspection reports, component traceability and a documentation set matching the client's own quality system are not optional extras on an EU-adjacent infrastructure contract — they are conditions of acceptance. This is where an experienced manufacturer separates from a trading company: the paperwork comes out of a factory quality system rather than being assembled afterwards.

Project at a glance

Country / regionBosnia
ApplicationAggregate production for highway construction
Scope suppliedComplete crushing and screening equipment set
Commercial structureOne supplier, one package, one responsible party for interfaces
DocumentationPrepared for European import and client inspection
Full project sheetAvailable on request
A note on certification. Requirements differ by country and by client. If your project specifies CE marking, particular material certificates or a third-party inspection regime, tell us at enquiry stage rather than at delivery — the documentation has to be produced during manufacture, not after. See Factory & Trust for what we normally issue.

Supplying an infrastructure project?

Tell us the specification, the inspection regime and the documentation the client requires. We will confirm what we can issue and what we cannot, before you commit.

Get a Quote WhatsApp