Because liner failure is planned, frequent and bulky — once one set goes on the machine, you need another set on the shelf for the emergency.

27 November 2026Published
Cone crusherCategory

In the minimum stock list for wear parts, the moving cone liner and the fixed cone liner are stocked at 2 pieces each, while the eccentric bushing, drive shaft and spherical bearing are stocked at 1. Liners must be replaced on schedule — it is a planned shutdown job, and the cost of one stop is far more than the part itself. More to the point, a liner is a casting with a long production lead time: place an order in a hurry and it may not arrive for months. Stocking 2 means that after one set goes onto the machine, another sits in the storeroom for the emergency, so transit time never stretches into lost production.

The drive shaft and spherical bearing fail far less often, so 1 piece each is enough. Shuangjin supplies a wear-parts list with recommended stock levels with every machine, and can schedule deliveries around your commissioning plan.

Applicable models: Shuangjin SK.D series multi-cylinder hydraulic cone crushers (wear-parts list and recommended stock levels supplied with the machine)

Related product: SK.D multi-cylinder hydraulic cone crusher

A question this article does not cover?

Ask us directly. If it is a question we are asked often, it becomes the next article — and you get the answer either way.

Get a Quote WhatsApp