Before a new jaw crusher starts up, the inspection items matter more than the test run itself — only after all seven checks are done can you talk about starting it; cut corners here and you will pay for it later in shutdowns.
Seven things to check before starting: jaw-plate wear and discharge-opening size; whether any ore is left in the chamber (large lumps must be taken out first); connecting bolts; the pulley and flywheel guards; the tension of the V-belts and tie-rod spring; the oil level in the tank and the lubrication system; and the electrical equipment and signalling system.
Each of the seven prevents a class of accident, and missing even one is enough to force a shutdown: starting with a large lump in the chamber sends the impact load straight onto the jaw and toggle plates; loose connecting bolts crack the frame; turning before lubrication is established destroys the bearing bushes first; a missing guard turns the flywheel into an exposed hazard.
The start-up order cannot be rushed: start the oil pump and cooling system first, wait three to four minutes until the oil-pressure and oil-flow indicators read normal, then start the main motor. The main machine must start unloaded; only when it is running normally do you start the feeder, increasing the ore gradually up to full load.
After start-up, make a point of listening once for abnormal sounds — any unusual knocking means stop and find the cause. This idle period is the only chance to hear the machine's condition clearly with no material in it. Shuangjin signs off on this checklist item by item during installation and commissioning, recording the baseline discharge opening and the normal oil-pressure and oil-flow readings in the handover sheet.