How do you configure a construction and demolition waste plant?

The difficulty with C&D waste is not hardness, it is a mixed feed. Tramp iron removal, soil removal and feed uniformity are the whole design.

20 November 2026Published
Flowsheet & sizingCategory

The trouble arrives in three forms. Rebar and steel scrap either jam the chamber or break the machine outright. Soil blocks the crushing chamber and the screen apertures at the same time. Oversized lumps of irregular shape bridge across the feed opening.

Set three lines of defence: pick the iron out before the crusher, rely on the crusher's own tramp-iron protection, and inspect by hand on the belt. Fit two magnetic separators, and there must be one ahead of the secondary and tertiary stage.

At the feed end a grizzly feeder drops the fines and the soil out first. Where moisture and clay are over the line, above 5% moisture and 5-8% clay, add pre-screening and then consider washing.

Machine choice follows hardness. Concrete rubble sits at or below medium-hard: jaw crusher for primary, impact crusher for secondary, circular vibrating screen for classification.

Shuangjin's Yuhang C&D waste station is a 500 t/h wet line: separate first, wash second.

Applicable models: Shuangjin SJ.F series impact crushers / SJ.G.Z series grizzly feeders

Related product: SJ.F impact crusher