How do you configure a 500 t/h crushing line?

500 t/h sits comfortably inside jaw crusher territory — a gyratory is more than the job needs. One large jaw crusher leads as the primary, with two machines for secondary and fine crushing.

26 November 2026Published
Flowsheet & sizingCategory

Shuangjin's SJ.E jaw crushers are rated 50–1200 t/h, and 500 t/h falls in the middle of that band; the SK gyratory starts at 750 t/h and tops out at 2500, so its floor already overshoots 500 — choosing it would mean running a big horse on a small cart. One large-size jaw crusher covers the primary stage.

Two machines for secondary and fine crushing is the norm: the SK.D multi-cylinder cone takes 300 mm feed and delivers 145–1000 t/h, and once the crushability factor is applied to hard rock (0.9–0.95 on the hard-rock band), a single unit usually falls short. Round the configuration out per standard practice: more than two fine crushers get a distributing ore bin, iron removal goes in ahead of secondary and fine crushing, and screens and belts are sized by actual throughput.

Shuangjin's 500 t/h package: one large jaw crusher up front, two multi-cylinder cones behind, and a closed circuit with a check screen at the end.

Applicable models: Shuangjin SJ.E series jaw crushers / SK.D series multi-cylinder cone crushers

Related product: SK.D multi-cylinder hydraulic cone crusher