How do you configure a 1,500 t/h crushing line?

At 1,500 t/h the primary-crushing question has only two answers — one gyratory or two jaw crushers — and what is being compared is not just equipment price but foundations and elevation headroom.

24 November 2026Published
Process designCategory

A single gyratory wins on configuration and feeding: it can be choke-fed, run-of-mine rock is tipped straight in from the truck body, and no ore bin or feeder is required. Two jaw crushers need two feeding systems and two discharge conveyors. The jaw pair wins on civil works and flexibility: a gyratory stands tall with a deep foundation and heavy civil investment, while two jaws can be phased in — start with one machine to guarantee commissioning.

One more line tips the balance: when a single gyratory stops, the whole line stops; with two jaws, one machine down still leaves half the output. For secondary and tertiary duty at 1,500 t/h, three to four cone crushers are typical — SK.D (145–1,000 t/h) or SK.Y (200–1,150 t/h) matched to the duty.

At this capacity Shuangjin asks first for the largest feed lump size, and whether the civil cost of going straight to a gyratory is acceptable.

Applicable models: Shuangjin SK series gyratory crushers / SK.Y series single-cylinder cone crushers

Related product: SK.Y single-cylinder hydraulic cone crusher

A question this article does not cover?

Ask us directly. If it is a question we are asked often, it becomes the next article — and you get the answer either way.

Get a Quote WhatsApp